SDLC is not a well-defined, structured sequence of stages in software engineering to develop the intended software product. July 28, 2021July 28, 2021 administrator SDLC is not a well-defined, structured sequence of stages in software engineering to develop the intended software product.FALSETRUESometimesNone of the Options are Correct
Which level of sub-system is used of an application? July 28, 2021July 28, 2021 administrator Which level of sub-system is used of an application?Component levelApplication levelModules LevelNone of the Options is Correct
Which of these software characteristics are used to determine the scope of a software project? July 28, 2021July 28, 2021 administrator Which of these software characteristics are used to determine the scope of a software project?Information Objectives, function, performanceOnly PerformanceOnly ContextNone of the Options is Correct
For the best Software model suitable for the project, In which of the phase the developers decide a roadmap for project plan? July 28, 2021July 28, 2021 administrator For the best Software model suitable for the project, In which of the phase the developers decide a roadmap for project plan?System AnalysisSoftware DesignCodingTesting
Constantine suggest four “organizational paradigms” for software engineering teams. The best project team organizational model to use when handling extremely complex problems is _____? July 28, 2021July 28, 2021 administrator Constantine suggest four “organizational paradigms” for software engineering teams. The best project team organizational model to use when handling extremely complex problems is _____?Random ParadigmOpen ParadigmSynchronous ParadigmClosed Paradigm
You are working in CareerRide as a Project Manager. What will you do to minimize the risk of software failure? July 28, 2021July 28, 2021 administrator You are working in CareerRide as a Project Manager. What will you do to minimize the risk of software failure?Track progressRequest a large budgetYou will increase the team sizeNone of the Options is Correct
Line of code (LOC) of the product comes under which type of measures? July 28, 2021July 28, 2021 administrator Line of code (LOC) of the product comes under which type of measures?Direct measuresIndirect MeasuresCodingNone of the Options is Correct
Which of the items listed below is not one of the software engineering layers? July 28, 2021July 28, 2021 administrator Which of the items listed below is not one of the software engineering layers?ManufacturingProcessMethodsTools
First level of prototype is evaluated by ____. July 28, 2021July 28, 2021 administrator First level of prototype is evaluated by ____.UserDeveloperTesterSystem Analyst
Abbreviate the term CMMI. July 28, 2021July 28, 2021 administrator Abbreviate the term CMMI.Capability Maturity Model IntegrationCapability Model Maturity InstructionsCapability Maturity Model InstructionCapability Model Maturity Integration